少妇二区三区_又爽又粗又黄视频_波多野结衣AV在线无码中文观看_国产一区蜜臂av色欲_黑森林精选AV导航_免费真实播放国产伦视频_18禁成人在线导航_午夜理论片yy6080私人影院

Kunshan Huashiyuan Measurement and control technology co., LTD

Focus on the field of automation measurement and control

Intelligent Equipment Design and Manufacturing Enterprise Integrating R&D, Production, Sales and Service

Pursuing Excellence and Creating Glory Together

Quality, delivery, value, service

01 02
Your current location:Home > Solutions > New energy

Power distribution unit test equipment

2019-08-21 09:58:03Click: 3116次

Power distribution unit test equipment

New energy automobiles propose higher standard and quality requirements on connectors and power distribution equipment of new energy. The technical processes of power distribution equipment include part assembly, screw assembly, CCD test, high voltage test, air-tight test, impedance test, and strong current test. 

電源分配單元測試設備

image.png


Features:

1. Whole-process guidance and monitoring on the software interface, and upload data such as position and torsion of screws assembly on the workstation.

2. Flexible production line can meet assembly test needs of products with different part numbers.

3. The server can control parameters and test items, ensuring convenient and fast switching of production standard and technique requirements.

4. The tracking function can track the production and test data of the production line, and prevent products’ jumping into another workstation.


image.png

Equipment parameters:

Reference dimension: 20m* 1.5m* 1.95m

Cycle time: 160S/PC

OEE:≥90%.

Technical parameters:

Air tightness: 6PSI/45s / ≤58CC/min

Leakage current: DC 2800V / 5s / ≤10mA;

Insulation resistance: DC1000V / ≥100MΩ;

Current sensor test: 350A /  ±3.5%

Resistance of precharged relay: 33Ω±5%;

Operation time of main relay: ≤20ms;

Release time of main relay: ≤12ms;

Next:Already is the last article